Latest Circulars : Slum Rehabilitation Authority (SRA)


Latst Circulars

Total Records:91
Sr.No. Department Name Document Title Circular Number Circular Date Download File
1 Deputy Collector Department CIRCULAR SRA/Dyce/Ow/205/2022 29/07/2022 CIRCULAR
2 Chief Executive Officer CIRCULAR NO. 37 MMR,SRA/Circular/40/2022 28/12/2022 CIRCULAR NO. 37
3 Chief Executive Officer CIRCULAR NO. 35A MMR,SRA/Circular/39/2022 28/12/2022 CIRCULAR NO. 35A
4 CTSO Department CIRCULAR No. 39, Thane MMR. MMR,SRA/Circular-42/2023 25/08/2023 CIRCULAR No. 39, Thane MMR.
5 Finance Department विकासकाकडून अनामत स्वरुपात बँक हमीपत्र/सयुक्त मुदत ठेव/पे ऑर्डर/डिमांड ड्राफट/NEFT/RTGS प्राप्त करुन घेण्याबाबत. 221 18/07/2024 विकासकाकडून अनामत स्वरुपात बँक हमीपत्र/सयुक्त मुदत ठेव/पे ऑर्डर/डिमांड ड्राफट/NEFT/RTGS प्राप्त करुन घेण्याबाबत.
6 Finance Department शासनास व इतर नियोजन प्राधिकरणास भरणा करण्यात यावायाच्या विविध अधिमूल्यामध्ये हप्त्याची सवलत मिळणेबाबत. 220 02/07/2024 शासनास व इतर नियोजन प्राधिकरणास भरणा करण्यात यावायाच्या विविध अधिमूल्यामध्ये हप्त्याची सवलत मिळणेबाबत.
7 Administrative Department Taining to ther members of Society through appropriate Licensed professional for ensuring life safety measures of structural, Electrical, 219 25/04/2024 Taining to ther members of Society through appropriate Licensed professional for ensuring life safety measures of structural, Electrical,
8 Administrative Department All the Competent Authorities are hereby directed to generate Annexure-II Only by Using Auto Annexure-II Application. 217 12/02/2024 All the Competent Authorities are hereby directed to generate Annexure-II Only by Using Auto Annexure-II Application.
9 Engineering Department Defect Liability Period For Rehabilitation Buildings in all SR Schemes. 216 21/02/2024 Defect Liability Period For Rehabilitation Buildings in all SR Schemes.
10 Engineering Department Fire precautionary measures to ensure safety from fire bt fixing of Wrought Iron Spiral Ladder to existing Rehab Building 215-A 21/02/2024 Fire precautionary measures to ensure safety from fire bt fixing of Wrought Iron Spiral Ladder to existing Rehab Building
11 Administrative Department Fire Precautionary Mensures to ensure sefety from fire by Fixing of Wronght Lron Spral to existing Rehab Building/wing & Close steel doors in place of grill doors 215 08/12/2023 Fire Precautionary Mensures to ensure sefety from fire by Fixing of Wronght Lron Spral to existing Rehab Building/wing & Close steel doors in place of grill doors
12 Information Technology Department परिपत्रक क्र. 214 214 27/10/2023 परिपत्रक क्र. 214
13 Chief Executive Officer Measures to be take to contro0l the environmental pollution due to Building Construction activities. 213 23/10/2023 Measures to be take to contro0l the environmental pollution due to Building Construction activities.
14 Administrative Department Circular No 212 212 16/10/2023 Circular No 212
15 Chief Executive Officer झोपडपट्टी पुनर्वसन योजनेअंतर्गत सशुल्क पुनर्वसन योग्य झोपडीधारकांचे शुल्क भरणा करणेबाबत अटी व शर्ती. 211 05/09/2023 झोपडपट्टी पुनर्वसन योजनेअंतर्गत सशुल्क पुनर्वसन योग्य झोपडीधारकांचे शुल्क भरणा करणेबाबत अटी व शर्ती.